Huawei project

1. Construction Engineering-Huawei-Azercell project:
a. TSSR – determination of parameters for areas to be built:
b. SWAP - replacement of old equipment with new ones at sites:
c. NEW – installation of new equipment on newly installed towers and poles:
d. Band Additional – installation of additional sectors and new equipment for additional sectors at sites:
e. Smart site – installation of new type alarm signal sensors at sites:

  • 2. Construction Engineering-Huawei-Azerconnect project:
    a. TSSR – determination of parameters for areas to be built:
    b. SWAP - replacement of old equipment with new ones at sites:
    c. Site Consolidation Installation – replacement of 900 radio modules at sites with new type 900 radio modules and consolidation of 2 system modules at site by keeping one:
    d. Expansion scenario – installation of 1800 Radio modules dismantled from Baku region to sites and replacement of antennas that do not support 1800 MHz:
    e. Lampole site building scenario – construction of new sites within camouflage so that sites are not visible from outside:
    f. BSC/RNC Installation – replacement of old equipment with new ones in the central supply part of sites operating in the Republic territory:
    g. Region Step Upgrade – updating the software of sites by adding boards to operating sites (increasing channels - expanding coverage area)